For splashing we need to do the following:

Hull exterior

  1. Fix stringers (dry out/replace or seal any issues)
  2. Any water intrusion issues indicated in survey (topside & transom.  Send a copy of survey to NorthCoast)
  3. Fix gunnel cap & install new rod holders (port/starboard corner holders and center transom holder need to be vertical swivel holders. 2 port and 2 starboard holders can be angled.)
  4. Replace hatch hardware
  5. Hard top/windows
  6. Reconfigure electronics box for flush mounting
  7. Windshield wipers
  8. Bow railing has issues in places (water intrusion too I think)
  9. Anchor windlass installed
  10. New outriggers
  11. New hardtop/marling tower/windows/enclosure
  12. Remote search light on hardtop
  13. Deck floodlights mounted in hardtop
  14. New Soundown in entire engine box, under floor and on ceiling of hardtop
  15. Swim platform installed (cut in tuna door?)
  16. Replace through-hulls
  17. New deck fill plates (water/diesel/waste)
  18. Restore exterior finish, boot stripe and bottom paint

Cabin/cockpit

  1. Interior and hardtop lighting upgraded
  2. New speakers installed for VHF & stereo
  3. Replace front hatch
  4. Cockpit sole in cabin
  5. Headliner interior
  6. Cushion engine box top/back for seating
  7. Flex trim around base of engine boxes
  8. Repair hatch hardware on engine boxes
  9. Reinstall toilet (hose leak)
  10. Cushion replaced V-birth
  11. New door to cabin
  12. Check freshwater & saltwater washdowns are working
  13. Install instant hot-water heater

Engines

  1. Go through both engines & injectors
  2. Water pumps checked
  3. Replace manifold/risers?
  4. Air filters for Cummins
  5. Oil change
  6. Replace Racor filters

Electrical

  1. Make sure batteries are charged
  2. Re-wiring engine and electronics
  3. Update/fix electrical panel
  4. Shore power wiring replaced
  5. AC/DC inverter
  6. Install front & rear bilge with autoswitch
  7. Install new electronics (GPS, radar, fish-finder, 2 VHF’s)
  8. New antennas
  9. Gauges – RPM, temperature, oil, volt/hour meter (entire panel)
  10. Underwater lights installed in transom
  11. New horn/running lights
  12. New compass
  13. Epirb
  14. New trim tabs switches

Helm/running gear

  1. Steering replaced/repaired
  2. Engine controls/throttle/shift system replaced/repaired
  3. Cutlass bearings replaced
  4. Zincs replaced
  5. Prop scan/tuning
  6. Adjust steering/repack rudder stuffing box

We’ve decided not to tackle “The List” in its entirety this season.  Instead we’ll do the majority of this in order to get the boat in the water and then take it project by project from there.  In my next installment, I’ll fill you in on where we are at with the project and what we’re doing with C&C marine currently at the NorthCoast factory.